-
We were sitting at the front in the sun
having some lunch and somebody inside pushed the duress and you could hear the screaming, so
it was a legit one.
Standing Committees
55th Parliament (Current)
-
Standing Committees
55th Parliament (Current)
-
Standing Committees
55th Parliament (Current)
-
To give another Eyre Peninsula example of this, the footprint for Lincoln Minerals’ proposed Gum
Flat Stage 1 iron ore mine, including waste dumps, ROM pads, and site infrastructure is only 60
hectares (about the size of Port Lincoln Racecourse).
Select Committees
52nd Parliament
-
THE 2010 HARVEST EXPERIENCE
2.1 Growers, harvest impacts and returns – Michael Schaefer (SAFFGIC)
The major concerns expressed by growers during the 2010 season included:
• Lack of information on stocks x grade, quality, volume on a site/port zone basis
Select Committees
52nd Parliament
-
We were sitting at the front in the sun
having some lunch and somebody inside pushed the duress and you could hear the screaming, so
it was a legit one.
Standing Committees
53rd Parliament
-
We did a lot of the YourSAy surveys, which is the government site, but we also did
a lot of promotions through media outlets as well—both the local messengers and the like—to get
people to know that we were out there ready to speak to them.
Standing Committees
53rd Parliament
-
We did a lot of the YourSAy surveys, which is the government site, but we also did
a lot of promotions through media outlets as well—both the local messengers and the like—to get
people to know that we were out there ready to speak to them.
Standing Committees
55th Parliament (Current)
-
SITE OWNERSHIP DETAILS 5
5.
Standing Committees
52nd Parliament
-
Title F site is a 7.9 hectare port facility, with
around 3 hectares leased to OneSteel.
Standing Committees
52nd Parliament